Jump to content
 English      
HP.com Home Products and Services Support and Drivers Solutions How to Buy
» Contact HP
     Forums advanced search
HP.com Home
IT Resource Center Forums > Storage > HP LeftHand P4000

Move LeftHand cluster to new switches

» 

IT Resource Center

» Login
» Register
» My profile
» Search knowledge base
» Forums
» Patch database
» Download drivers, software and firmware
» Warranty check
» Support Case Manager
» Software Update Manager
» Training and Education
» More maintenance and support options
» Online help
» Site map

Member icons
 
 HP moderator  HP moderator
 Expert in this area  Expert in this area
Member status
ITRC Pro ITRC Pro
250 points
ITRC Graduate ITRC Graduate
500 points
ITRC Wizard ITRC Wizard
1000 points
ITRC Royalty ITRC Royalty
2500 points
ITRC Pharaoh ITRC Pharaoh
7500 points
Olympian Olympian
20000 points
1-Star Olympian 1-Star Olympian
40000 points
2-Star Olympian 2-Star Olympian
80000 points
»  How to earn points
»  Support forums FAQs
Question status
Magical answer Magical answer
Message with a response that solved the author's question
Favorites status
Add to my favorites Add to my favorites
Delete from my favorites Delete from my favorites
This thread has been closed Thread closed
 

Content starts here
   Create a new message    Receive e-mail notification if a new reply is posted  Reply to this message
Author Subject: Move LeftHand cluster to new switches      Add to my favorites
kghammond Expert in this area
Nov 2, 2009 21:15:58 GMT   

We have two 2-node LeftHand clusters.  We recently bought some newer bigger backplane switches.  We need to move our LeftHand clusters to the new switches.

Ideally we want to create zero downtime for the clusters.

Currently all nodes have two bonded nic's using eight total ports on the current switch.  We have the vlan's trunked to the new switching infrastructure.

I can see two possible solutions:

1)  We quickly unplug and plug the switch ports to the new switch, wait for arp timeouts and re-sync if necessary.  In this scenario, would it be better to move the VIP owner first or second?  Will our VMware LUN's lose connectivity at all during the VIP failover?  Is there a manual way to move the VIP?

2)  We take each individual node offline via CMC (shutdown).  Then plugin the new switch ports, then boot the node back online and then re-sync via CMC.  Once again, move VIP first or second with this solution.

Any preferences to 1 or 2 and are there any other solutions that might be cleaner yet?

Thank You,
Kevin
Note: If you are the author of this question and wish to assign points to any of the answers, please login first.For more information on assigning points ,click here


Sort Answers By: Date or Points
Bryan McMullan
Nov 3, 2009 12:52:38 GMT  10 pts

Sounds a bit dangerous. I'd highly recommend waiting until a maintenance window, but I'm sure you've already thought of that. So to answer your question....

1) I believe the timeout for the VIP is about 15 seconds, that 15 seconds is supposed to guarantee that the VIP is down before the cluster chooses another node. If you only have VMWare connected to it, you may be okay with doing a quick pull and plug. When we upgraded the software on our Catalyst 3750 stack, our connection from our ESX cluster to the SAN was dropped. We left a couple test machines on to see what would happen. Surprisingly, they simply paused until connectivity was re-established. No harm, no foul. You'll most likely see errors on ESX, but I don't think it will drop the LUN (ours didn't and it was down longer than 1 minute). As for manually moving the VIP, unfortunately...there is no method available. I've begged and pleaded with LHN for this capability, and perhaps it will come in the future.

2) This seems much more reasonable. What is your connection between the new hardware and old hardware? If it will be fully routed and at least a Gb or higher, this would be the direction I'd personally go. You'd want to move the VIP second in this solution. Be aware that you may (likely) still have a blip while the VIP times out and changes, but I think this is a safer method.

I can't really think of any other options. I guess if you are using the adaptive load balancing on the dual NICs in your unit, you could put one from each unit into the new hardware (with the ports in a shutdown state) and then down the ones on the old one and bring the new ones up. That would be quicker than the pull and plug, and all the units can function with just a single NIC. You can then move the remaining NICs over at your leisure.

Good luck!
 
Create a new message    Receive e-mail notification if a new reply is posted   Reply to this message
 
 
Printable version
Privacy statement Using this site means you accept its terms
© 2009 Hewlett-Packard Development Company, L.P.