Jump to content
 English      
HP.com Home Products and Services Support and Drivers Solutions How to Buy
» Contact HP
     Forums advanced search
HP.com Home
IT Resource Center Forums > Storage > HP LeftHand P4000

San IQ 7 to San IQ 8.1 Upgrade Questions - This thread has been closed

» 

IT Resource Center

» Login
» Register
» My profile
» Search knowledge base
» Forums
» Patch database
» Download drivers, software and firmware
» Warranty check
» Support Case Manager
» Software Update Manager
» Training and Education
» More maintenance and support options
» Online help
» Site map

Member icons
 
 HP moderator  HP moderator
 Expert in this area  Expert in this area
Member status
ITRC Pro ITRC Pro
250 points
ITRC Graduate ITRC Graduate
500 points
ITRC Wizard ITRC Wizard
1000 points
ITRC Royalty ITRC Royalty
2500 points
ITRC Pharaoh ITRC Pharaoh
7500 points
Olympian Olympian
20000 points
1-Star Olympian 1-Star Olympian
40000 points
2-Star Olympian 2-Star Olympian
80000 points
»  How to earn points
»  Support forums FAQs
Question status
Magical answer Magical answer
Message with a response that solved the author's question
Favorites status
Add to my favorites Add to my favorites
Delete from my favorites Delete from my favorites
This thread has been closed Thread closed
 

Content starts here
   Create a new message    Receive e-mail notification if a new reply is posted  Reply to this message
Author Subject: San IQ 7 to San IQ 8.1 Upgrade Questions      Add to my favorites  This thread has been closed
Dave Hamblin
Oct 30, 2009 15:16:25 GMT   

Our existing LHSan cluster is at SanIQ7. Its a 3.4 TB unit that has about 300 GB open.

Our new units (seperate cluster and managment group) are SanIQ8.1. They came in as 8.0, I upgraded to 8.1 which went fine and very fast, but they also have no volumes or data defined yet.

My question is upgrading the two 7.0 to 8.1. Can anyone tell me if this also is a fairly quick process and if there is any gotcha's or the like? I wasn't sure if the amount of data on the units plays any role in upgrade time or difficulty?
Note: If you are the author of this question and wish to assign points to any of the answers, please login first.For more information on assigning points ,click here


Sort Answers By: Date or Points
teledata Expert in this area
Oct 30, 2009 19:31:22 GMT  0 pts

Are you migrating the data off to your new cluster, or do you intend to do an "in place" upgrade?
Dave Hamblin
Oct 30, 2009 19:34:00 GMT    N/A: Question Author

The new san is for new data/servers.

The existing data will remain on the existing LHSan, so it would be an inplace upgrade.

We were going to upgrade the existing units so they were current, or is this one of those "let sleeping dogs lay" (ie we should leave them alone).
Mark... This member has accumulated 500 or more points
Oct 31, 2009 13:51:47 GMT  3 pts

Hi,
As far as I know it is painless and can be done online. You should always read any release notes first which should advise you of any gotchas!
However, I believe when you do the upgrade it is recommended to only do one node at a time and make sure that you do the node that is serving out the VIP LAST.
Mark...
HP moderator Gauche
Oct 31, 2009 14:01:56 GMT  5 pts

Doing one node at a time and doing the vip last is something the upgrade process automates.

The tip to read the release notes is a good idea as their might be a patch that is suggested for you to install before the upgrade.

The size of data in the SAN does not impact how long it takes to apply the upgrade at all.

The number of nodes, and how much data you write to the SAN during the upgrade, both affect how long it takes.
Number of nodes matters because it does one node at a time.
How much you write to the SAN matters because the upgrades will wait for all volumes to re-syncronize between node reboots, and if you write 1GB of data while a node is rebooting, you'll have to wait longer for the 1GB to re-sychronize before the next node can start installing.

The less load the system is under during the upgrade the faster it will go.
Dave Hamblin
Nov 2, 2009 12:15:50 GMT    N/A: Question Author

Thanks all! I will go through the release notes to make sure I am ready for the upgrade.
Bryan McMullan
Nov 2, 2009 15:31:39 GMT  9 pts

I just upgraded our 50 nodes from 7.0 SP1 to 8.1. It went pretty smooth. The path to follow is:

1. Install Updated CMC.
2. If applicable, upgrade the DSM's for MPIO. This is a pain as it requires the old one to be uninstalled and is multiple reboots (if you are going from 7 to 8, not bad if from 8 to 8.1).
3. Upgrade all Remote Clusters (normal -> managers -> VIPs).
4. Upgrade normal nodes (non manager/non VIP).
5. Upgrade managers
6. Upgrade VIP.

NSM160's took about 18 minutes per upgrade. x3650's took about 6 minutes per upgrade. DL320/P4000's took about 6 minutes per upgrade. This is with about 30TB of data during production hours.

We did take all our connected servers offline for the manager/VIP updates as the systems wait 15 seconds I think before they hand off if you down the VIP (causing iSCSIprt errors on Windows and lockups on ESX). As we are very data intensive, I find it safer to go this route.

Good luck!
Dave Hamblin
Nov 2, 2009 15:33:28 GMT    N/A: Question Author

Thanks! Very helpful.
Dave Hamblin
Nov 2, 2009 16:36:11 GMT    N/A: Question Author

Hmm, I don't see the release notes on the HP site where I downloaded the 8.1 upgrade; anyone know where they are in the HP site?
Dave Hamblin
Nov 2, 2009 18:14:35 GMT    N/A: Question Author

Never mind, I found them, I am closing this thread as resolved.
Dave Hamblin
Nov 2, 2009 18:15:08 GMT   Thread closed by author  

Answer were given above.
 
Create a new message    Receive e-mail notification if a new reply is posted   Reply to this message
 
 
Printable version
Privacy statement Using this site means you accept its terms
© 2009 Hewlett-Packard Development Company, L.P.